Skip navigation
Run Run Shaw Library City University of Hong KongRun Run Shaw Library

Please use this identifier to cite or link to this item: http://dspace.cityu.edu.hk/handle/2031/9630
Project No.: 6000658
Title: Integrating CANVAS in BIM-facilitated Quantity Surveying Education at CAVE Room
Department: Division of Building Science and Technology (BST)
Principal Investigator: Tam, CM
Co-investigator: Fung, Ivan Wing-Hong (ACE); Chan, Isabelle YS (External)
Issue Date: 12-Jul-2023
Commencement Date: Jan-2018
Completion Date: Dec-2019
Abstract: Nowadays, the AEC (Architecture-Engineering and Construction) industry is facing a technological change represented by the transition from CAD-based (Computer Aided Design) documentation to BIM (Building Information Modeling). BIM takes architectural design to the next level by offering expanded range of possibilities due to the immense amount of information which can be encapsulated and later extracted from digital models. BIM will also become the DNA of future construction. In addition to the traditional 3D design modelling, BIM facilitates collaborative working amongst various project parties in 4D (time), 5D (cost), and 6D (operations) manner. BIM can be used to assist in performing quantity surveying and cost estimation from the beginning of the design process. This BIM-facilitated quantity surveying process allows the project team to make informed decisions on project constructability and curb excessive budget overruns due to project modifications, especially on some mega-specialist projects, such as re-development of hospital, etc.
Appears in Collections:Teaching Development Grant Projects

Files in This Item:
File SizeFormat 
final_report.html148 BHTMLView/Open
Show full item record


Items in Digital CityU Collections are protected by copyright, with all rights reserved, unless otherwise indicated.

Send feedback to Library Systems
Privacy Policy | Copyright | Disclaimer